454A Energy-saving Servo Low-pressure Casting Machine
Company Introduction:
Our company offers variety of products which can meet your multifarious demands.We adhere to the management principles of "quality first, customer first and credit-based"since the establishment of the company and always do our best to satisfy potential needs of our customers. Our company is sincerely willing to cooperate with enterprises from all over the world in order to realize a win-win situation since the trend of economic globalization has developed with an irresistible force.
Product Information:
- The sturdy frame-type eight-guide pillar structure has high positioning accuracy; the side mold cylinder adopts an embedded type to reduce the width.
- The platform lifting cylinder, with the piston rod working upwards, ensures 100% safety.
- Four side mold mechanisms installed at 90 degrees, each with four guide pillars, ensure the smooth movement of the side mold and increase the service life of the cylinder.
- Two vertical motion hydraulic cylinders controlled by two reversing valves of different sizes drag the platform to move up and down, which can achieve fast and slow motion.
Pictures For Reference:





Technical Parameters:
Total height |
1500+1620+1650 |
Workbench size |
1800*1200*120mm |
Stroke of the moving platen |
500-1300mm |
Clamping force(16MPa) |
≥180 |
Max mold weight |
10T |
Capacity of insulation furnace |
400kg |
Parallelism between the fixed platen and the moving platen |
≤0.5mm |
Total power supply |
AC380V,50HZ,≤60kw |
FAQ:
Q:How many days do you need to produce this machine?
A: Usually 15-25 days,it depends on the machine and power mode,
customized type will be 30-45 days,for production line equipments will take 2-3 moths.
Q: How to control your quality ?
A:First of all, we have professional technical team to design the machine. And we have strict production system, the quality inspection department will check the quality regularly.For the smaller machine we will install the machine at our workshop to make sure it can work well.For the bigger machine, we will install the machine for our customers until it can work well.
Q: What's your machine quality guarantee?
A:Usually it's one year. We will choose the world famous brand components to keep our machine in perfect working condition.
Q: Can you install the machine overseas?How long will it take?
A: Yes,we can arrange the engineer to come to help install,need to pay accordingly,like round trip tickets,salary,living and eating,etc.Time depending on the equipment your order,usually 30-60 days.